Process

Based on your inquiry, we create an initial 3D sketch and budget plan. This is followed by on-site planning, taking into account your wishes, structural conditions and ideas. We take measurements of the awning and provide you with a binding offer based on these measurements.

Once we have received your order, the German-made system will be ready for dispatch within 10 days. First, we install the mast system of the awning. We then take the final measurements for cutting the awning to size, which is also produced ready for dispatch within 10 days.

Finally, we integrate the awning into the existing mast system. As a rule, one working day is scheduled for the installation and assembly of the pole system and the integration of the awning.